客戶急時如何縮短环氧地坪的施工工期

文章时间:2018-10-19 00:23:07   浏览次数:1148

一般的大型工程(Engineering)在施工之前,都會有工期安排和工期預計,以保證各種工作的順利進行及其它工期時間的安排。然而在环氧地坪施工的過程(guò chéng)中,總會不可避免的遇到這樣或那樣的問題(Emerson),最終就有可能導致(cause)施工沒有辦法如期完成,給自己和客戶雙方帶來各種麻煩,所以在环氧地坪施工的過程中,施工方應制定好一定的計劃,確保工程(Engineering)可以如期完成。那麼,作為环氧地坪施工廠傢,如何才能保證工期的按時完成,甚至縮短工期呢?主要方法如下:
In general, before the construction of large-scale projects (Engineering), there will be a schedule and schedule, in order to ensure the smooth progress of various work and other schedule. However, in the construction process of epoxy floors (guchng), there will inevitably be some problems (Emerson), which may eventually lead to the construction can not be completed on schedule, and bring all kinds of troubles to both themselves and customers. Therefore, in the construction process of epoxy floors, the construction party should formulate a certain amount. Plan to ensure that the project (Engineering) can be completed on schedule. Then, as a manufacturer of epoxy floor construction, how can we ensure the completion of the project on time, or even shorten the construction period? The main methods are as follows:
1、組織一個以項目(xiàng mù)經理為首的權威現場施工領導班子,實行統一領導、統一管理(guǎn lǐ)、統一協調。金剛砂耐磨地坪礦物合金骨料(金剛砂)地面硬化劑由一定顆粒級配的礦物合金骨料,特種水泥,其它摻合料和外加劑組成,開袋即可使用。將其均勻地撒佈在即將初凝階段的混凝土表面,經專門手段加工,從而使其與混凝土地面形成一個整體,且具有高致密性和著色的高性能耐磨地面。
1. To organize an authoritative on-site construction leading group headed by the manager of the project (xia ng m_), to implement unified leadership, unified management (gu n l_) and unified coordination. The ground hardener of Wuhan emery wear-resistant floor mineral alloy aggregate (emery) is composed of mineral alloy aggregate with certain grain gradation, special cement, other admixtures and additives. It can be used in open bags. It is evenly spread on the surface of the concrete which is about to be initially solidified and processed by special means, so as to form a whole with the concrete surface, and has high compactness and colored high-performance wear-resistant ground.
2、做好工序前的準備(ready)工作,在工序前由施工員負責落實各方面的準備工作,如工作面,施工機械,主要材料(Material),技術復核和隱蔽工程(Engineering)檢驗等,並巡查落實。
2. Prepare for the working procedure. Before the working procedure, the builder is responsible for all aspects of the preparatory work, such as working face, construction machinery, main materials (Material), technical review and hidden engineering (Engineering) inspection, and inspection and implementation.
3、抓好開工前施工準備(ready)工作,開工前先遣部分管理(guǎn lǐ)人員進場,做好與建設單位(unit)、總承包單位關於場地交接工作,及時落實好實際進場時間,熟悉施工現場环境。金剛砂耐磨地坪硬化地面,俗稱金剛砂耐磨地坪。自上世紀70年代問世以來在歐美迅速普及,成為水磨石地面的完美換代產品,進入80年代末期,耐磨环氧地坪更是發達國傢的首選。
3. Grasp the ready work before the start of construction, advance part of the management (gu_n_ l_ a) personnel before the start of construction, do a good job with the construction unit (unit), the general contractor on the site handover work, timely implementation of the actual arrival time, familiar with the construction site environment. Wuhan emery abrasion resistant floor hardened ground, commonly known as emery abrasion resistant 彩色沥清地坪floor. Since the advent of the 1970s in Europe and the United States since the rapid popularization of terrazzo floor as a perfect replacement products, into the late 1980s, wear-resistant floor is the first choice of developed countries.
4、編好勞動力、施工機械設備、周轉材料(Material)計劃、合理組織計劃。
4, compile the labor force, construction machinery and equipment, Material, and organize the plan reasonably.
5、強化通訊聯絡、交通運輸、施工整體調度等各種手段,高效、科學指揮施工。环氧地坪是一種高強度、耐磨損、美觀的地板,具有無接縫、質地堅實、耐藥品性佳、防腐、防塵、保養方便、維護費用低廉等優點。
5. Strengthen communication and liaison, transportation, construction overall dispatch and other means, efficient and scientific command of construction. Wuhan epoxy floor is a kind of high-strength, wear-resistant, beautiful floor, with seamless, solid texture, good resistance to antisepsis, dust, easy maintenance, low maintenance costs and other advantages.
6、確保所有機械設備(shèbèi)(組成:驅動裝置、變速裝置等),周轉材料(Material),主要材料的按時供應,杜絕因材料供應不及時而造成的不必要的怠工。
6. Ensure the timely supply of all mechanical equipment (shbi) (composition: drive, transmission, etc.), Material, and major materials, and eliminate unnecessary idling caused by the lack of timely supply of materials.
7、制訂施工管理(guǎn lǐ)人員工作責任(zé rèn)制,做到職責明確,透水地坪獎罰分明。环氧地坪是一種高強度、耐磨損、美觀的地板,具有無接縫、質地堅實、耐藥品性佳、防腐、防塵、保養方便、維護費用低廉等優點。
7. Formulate the construction management (gun) personnel responsibility (z rn) system, so that the responsibilities are clear and the awards and penalties are clear. Wuhan epoxy floor is a kind of high-strength, wear-resistant, beautiful floor, with seamless, solid texture, good resistance to antisepsis, dust, easy maintenance, low maintenance costs and other advantages.
8、實行邊施工邊巡查,進行全過程(guò chéng)控制(control)。聚氨酯环氧地坪是指用聚氨酯地坪塗料結合一種新型無溶劑、無污染的地面裝飾施工技術,制成能滿足某些特定使用要求(高檔會議或娛樂中心註重舒適要求;工礦企業註重防腐和耐磨要求等)的一類地坪,故特別適用於各種工礦企業車間、停車場、運動場等有防滑、防腐、耐磨要求的地坪塗裝。采用分段分部位核驗查收,最大化減少中間环節,有利於實行施工作業的開展(kāi zhǎn),以縮短工期.
8, carry out inspections along the construction side and carry out the whole process (Gu ch ch ng) control (control). Wuhan Polyurethane Floor refers to the use of polyurethane floor coatings combined with a new solvent-free, pollution-free floor decoration construction technology, made to meet certain specific requirements (high-grade conference or entertainment centers pay attention to comfort requirements; industrial and mining enterprises pay attention to anticorrosion and wear resistance requirements, etc.), so it is particularly suitable for a variety of floors. Industrial and mining enterprises such as workshop, car park, sports ground and so on have anti-skid, anticorrosive and wear-resistant floor coating. It is advantageous to carry out the construction work (k_i_zh n) and shorten the construction period by adopting the checking and checking in sections and sections to minimize the intermediate links.